Salerno – Reggio Calabria motorway Macrolotto N.2

Integrated Tenders

Client ANAS

Learning outcomes

Design and execution of works

Motorway adaptation and modernization to type 1/A of the CNR/80 regulations. Altimetric rectification of the route and interventions aimed at adapting the route: in some cases the maintenance of the original route is envisaged where works to widen the motorway are planned whether it develops in a tunnel or on viaducts or on road bodies.

  • YEAR OF COMPLETION

    2014
  • AMOUNT

    €869m
  • PERFORMER

    Consorzio Stabile SIS (INC SpA 50,9%)
  • OBJECT

    Modernization and adaptation to type 1/a of the CNR/80 standards

Main data

Track

31

km in length

Natural Galleries

23

(10 double barrel + 2 single barrel

Artificial tunnels

4

Viaducts

64

(x2) 11.483 m long

Overpass

2